Application for new connection of water
Please go through checklist before start filling form
Please refer below instructions/guidelines to fill the application form:
In case of applicant already having water connection and wish to apply sewer connection, the application through 'Add Services' tab to be applied.
In case of applicant already having sewer connection and wish to apply water connection, the application through 'Add Services' tab to be applied.
- Water & Sewerage Connection - Select this radio button if wish to apply for Water & Sewerage connection both
- Water Connection - Select this radio button in case where no Sewerage System has been laid by DJB
- Sewerage Connection - Select this radio button in case Water Connection is not required
- Regularization - Select this radio button in case water/sewer connection is already installed without prior sanction
- Property Type: Applicant has to select one Property type out of the list. (Mandatory)
- No of Floors: Applicant has to enter No of floors of Property.(To be fed by single connection case of JJ Residential Colony)
- Plot Area(in Sq m): Enter Plot Area in square Meters. (Mandatory)
- Built Up Area: Enter Plot Area in square Meters less than Plot Area. (Mandatory)
- Water Connection Category: Applicant has to select purpose of Water Connection Category to be applied out of Commercial/Industrial or Domestic. (Mandatory)
- Water connection used by (for identification/tagging-purpose): Applicant has to select Water Connection Category used by for identification/tagging purpose out of the list.(Mandatory)
- Proof of Identity - List of acceptable documents are available at top of page.
- Ownership Status - List of acceptable documents are available at top of page.
- Property Ownership Document - List of acceptable documents are available at top of page.
- Others - List of acceptable documents are available at top of page.
- Driving License, PAN Card, Passport, Ration card with Applicant's photo ,Photo Identity Card issued by any govt. agency, Unique ID card[UID/Aadhaar Card], Voter Identification Card
- Document need to be downloaded, filled, signed & uploading the same in all cases other than having registered document of Ownership(Mandatory)
- Regd Sale Deed - Below mentioned all relevant pages of Regd Sale Deed must be uploaded: First Page, Page mentioning details of both the parties. Registration details page, Pages mentioning Plot Size, Unit Size/Built up Area, Last page having Signature.
- Electricity Bills in the name of Applicant(any 3), Regd Perpetual Lease Deed, Regd Conveyance Deed, Regd GPA, Ntd. GPA with complete backchain, SPA with Regd/Ntd. Agreement to Sell and Will, Will/NOC of the owner in favour of applicant, Regd Partition Deed , Regd Family settlement, Regd Relinquished Deed, Allotment letter(pvt builder) with regd Sale Deed, Allotment letter(pvt builder) with Regd/Ntd. GPA, Allotment letter(pvt builder), Regd/Ntd. Agreement to Sell, Rented proprty-Lease/Rent Agreement, NOC, Ownership Proof, DDA Allotment/mutation Letter/Land, Development Letter, Interim Court order
- NOC from Owner (If applicant is other than owner along with document of owner), NOC from MCD (If Commercial property is present in Residential Area), NOC from DPCC (If Commercial property is present in Residential)
- In case of Bulk Connection the following documents are needed: Layout Plan, Key Plan, Floor Plan, Site Plan, Total Water Demand, Completion Plan, Hydraulic Calculation Plan,
- Rain Water Harvesting Certificate (Mandatory for plot size more than 100 sq mt & failure of which will levy penalty as per of rules in regular bills after moratorium period upto 30.06.2022)
Checklist for Applying RWH Certificate
Download RWH Sample Form
Approved building sanction plan(File type - .jpg, .jpeg, .png or pdf of file size less than 2MB) Please refer below instructions/guidelines to fill the application form:
- Roof Top Area(In Sq m) Applicant has to fill Roof Top Area in square meters
- Paved/Pucca floor with non-pollution catchment area(In Sq m) Applicant has to fill Paved/Pucca floor with non-pollution catchment area in square meters
- Total Plot Area(In Sq m) - Applicant has to fill Total Plot Area in square meters.
If applicant selects Size of Pit as Rectangular then below details need to be filled: Length, Breadth & Depth in meter is entered accordingly which Total capacity in cum is calculated which is calculated by below formula: Total Capacity = Length * Breadth * Depth
- Bypass/Overflow system exist - Applicant has to select Yes/No whether Bypass/Overflow system exists or not.
- System is Functional - Applicant has to select Yes/No whether system is functional or not.
- System is Adequate - Applicant has to select Yes/No whether system is adequate or not.
- Proper conveyance system exists - Applicant has to select Yes/No whether proper conveyance system exists or not.
- Brick Aggregates 40 to 63 mm, size 0.5m thickness - Applicant has to select Yes/No in this field for the filter size.
- Charcoal/Activated carbon 0.1m thickness - Applicant has to select Yes/No whether Charcoal/Activated carbon is of 0.1m thickness or not.
- Sand (1.5mm - 2mm), size 0.2m thickness - Applicant has to select Yes/No in this field for the sand size.
- Geo textile membrane - Applicant has to select Yes/No whether Geo textile membrane exists or not.